Tech Support
RU ?

Bonus

November 2026, Option A (individual cap). Payout = cap x score x attendance.

Estimate?Live estimate with config version 11, month to date. Default cap 100 % per agent; per-agent caps and currencies are set in Settings. FCR counts only when close tagging is above 58%.

Bonus per agent
Agent First response within 5 min
target 85%
First contact resolution
target 30%
ScoreAttendancePayoutOption B (compare)
Georgi Mkhitaryan 93.3% (Stretch) 120% 28.9% (Threshold) 80% 1.00 100% 150,000.00 AMD
cap 150,000 AMD
181,291.39 AMD
Davit Matosyan 94.9% (Stretch) 120% 34.3% (Stretch) 120% 1.20 100% 180,000.00 AMD
cap 150,000 AMD
190,728.48 AMD
Temirlan Oraltai 86.0% (On target) 100% 16.3% (Below threshold) 0% 0.50 100% 92,500.00 KZT
cap 185,000 KZT
101,076.16 KZT
Elena Borovets 100.0% (Stretch) 120% 11.5% (Below threshold) 0% 0.60 100% 90,000.00 AMD
cap 150,000 AMD
146,026.49 AMD
Alexandr Paustyan - 0%
small sample, weight moved
- (Gate not met) 0%
small sample, weight moved
0.00 - 0.00 KZT
cap 185,000 KZT
0.00 KZT

Below threshold Threshold Target Stretch FRT 75 / 85 / 90%, FCR 28 / 30 / 32%, tagging gate above 58%

Why each agent got this score
  • Alexandr Paustyan: First contact resolution: only 0 in sample (minimum 30), weight moved to the other KPIs
  • Alexandr Paustyan: First contact resolution: close tagging None% is not above 58.0%, pays 0%
  • Alexandr Paustyan: First response within 5 min: only 0 in sample (minimum 30), weight moved to the other KPIs
  • Alexandr Paustyan: No KPI has enough data this month, so nothing is paid
  • Alexandr Paustyan: Attendance unknown: no scheduled shifts this month (or every shift excused), so nothing is paid

Edge watch

Tier steps mean a small change near a level moves the payout a lot.

Simulator?Try other settings without saving anything. Option B splits one pool (cap x agents) by score x routed volume x attendance, for comparison only.

Close month

Closing freezes the numbers above with config version 11. Close after the month ends, once late data has arrived (the plan says the 3rd working day).

Data through 03 Nov 2026 06:06 (Yerevan time).